Lote
NCCCO BUNDLED exams questions and 100% correct answers
NCCCO telescopic boom crane - fixed cab (TSS) exam questions and 100% correct answers NCCCO tower crane exam questions and 100% correct answers
[Mostrar más]NCCCO telescopic boom crane - fixed cab (TSS) exam questions and 100% correct answers NCCCO tower crane exam questions and 100% correct answers
[Mostrar más]Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? - correct answer The front 
 
What is the definition of "operating radius?" - correct answer The distance from the center of rotation of the crane to the center of gravit...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? - correct answer The front 
 
What is the definition of "operating radius?" - correct answer The distance from the center of rotation of the crane to the center of gravit...
Where is the best location for leveling a crane? - correct answer Upperworks 
 
When determining the "gross load" the best method is: - correct answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - correct answer Basket, vertical, cho...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhere is the best location for leveling a crane? - correct answer Upperworks 
 
When determining the "gross load" the best method is: - correct answer Get an accurate load weight and add the rigging. 
 
By order of hitch strength, which is the correct answer? - correct answer Basket, vertical, cho...
ancillary attachment - correct answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - correct answer a device that prevents two blocking from occurring if crane is used with lo...
Vista previa 2 fuera de 12 páginas
Añadir al carritoancillary attachment - correct answer devices attached to the crane that perform functions other than lifting a load with a hook, such as forks, augers, grapples, or a digging bucket 
 
anti-two block device - correct answer a device that prevents two blocking from occurring if crane is used with lo...
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct answer c. 
 
2. When hoisting personnel, within what percentage of le...
Vista previa 3 fuera de 17 páginas
Añadir al carrito1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - correct answer c. 
 
2. When hoisting personnel, within what percentage of le...
Timber or steel - correct answer These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - correct answer On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - correct answer Allows the...
Vista previa 2 fuera de 10 páginas
Añadir al carritoTimber or steel - correct answer These materials should be used when setting up on soft surfaces such as soft ground, asphalt or backfilled material 
 
Over the corner - correct answer On crawler cranes, which boom position creates the greatest ground pressure 
 
Blocking - correct answer Allows the...
ASME B30.5 - correct answer Mobile and Locomotive cranes, all types 
 
ASME B30.3 - correct answer Tower Cranes 
 
ASME B30.23 - correct answer Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - correct answer Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - corr...
Vista previa 2 fuera de 13 páginas
Añadir al carritoASME B30.5 - correct answer Mobile and Locomotive cranes, all types 
 
ASME B30.3 - correct answer Tower Cranes 
 
ASME B30.23 - correct answer Personel Lifting Regs 
 
OSHA 29 CFR 1926.1400 Series - correct answer Cranes & Derrick's used in Construction regs. 
 
Rotation Resistant Wire Rope - corr...
Boom up - correct answer What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - correct answer When hoisting personnel, within what percentage of level must a telescopic boom crane be ...
Vista previa 2 fuera de 5 páginas
Añadir al carritoBoom up - correct answer What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
 
1% - correct answer When hoisting personnel, within what percentage of level must a telescopic boom crane be ...
Before leveling a mobile crane on outriggers, an operator should ensure: - correct answer there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - correct answer Keeping 90 degree angle between...
Vista previa 2 fuera de 11 páginas
Añadir al carritoBefore leveling a mobile crane on outriggers, an operator should ensure: - correct answer there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - correct answer Keeping 90 degree angle between...
continuously - correct answer during all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements - correct answer if the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a - correct answer OSH...
Vista previa 2 fuera de 7 páginas
Añadir al carritocontinuously - correct answer during all crane movements, asme b30.5 states that communication shall be maintained 
 
stop crane movements - correct answer if the communication is disrupted at any time while the crane is operation, the operator shall 
 
osha 1926.1400 appendix a - correct answer OSH...
When making a multiple crane lift, it is important for the operator to understand that: - correct answer The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - correct answ...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhen making a multiple crane lift, it is important for the operator to understand that: - correct answer The weight may increase if the other crane lands the load 
 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the load radius will: - correct answ...
When tower crane is erected/dismantled, written instructions must be - correct answer On site 
 
Tower crane erection/dismantling shall be performed under direct supervision of the - correct answer Designated person 
 
What is the minimum clearance from obstruction when the tower crane freely rotate...
Vista previa 1 fuera de 4 páginas
Añadir al carritoWhen tower crane is erected/dismantled, written instructions must be - correct answer On site 
 
Tower crane erection/dismantling shall be performed under direct supervision of the - correct answer Designated person 
 
What is the minimum clearance from obstruction when the tower crane freely rotate...
Which of the following is an accurate statement about luffing jibs? - correct answer It raises and lowers independent from the boom 
 
What is the weakest quadrant of a boom truck? - correct answer Front 
 
What effect would blocking up the ends of the tracks have on a crane? - correct answer It wou...
Vista previa 2 fuera de 14 páginas
Añadir al carritoWhich of the following is an accurate statement about luffing jibs? - correct answer It raises and lowers independent from the boom 
 
What is the weakest quadrant of a boom truck? - correct answer Front 
 
What effect would blocking up the ends of the tracks have on a crane? - correct answer It wou...
The crane is out of level, you release the swing break, the boom swings downhill, your: - correct answer Load radius increases 
 
Blocking can be placed under the ends of tracks to: - correct answer Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least a...
Vista previa 2 fuera de 5 páginas
Añadir al carritoThe crane is out of level, you release the swing break, the boom swings downhill, your: - correct answer Load radius increases 
 
Blocking can be placed under the ends of tracks to: - correct answer Increase the cranes stability when Operating over front or back 
 
What quadrant produces the least a...
A&L - correct answer Antenna & Line Specialty 
 
A designation of the NWSA Telecommunication Program 
 
ABC - correct answer Articulating Boom Crane 
 
A designation of the NCCCO Articulating Crane Program 
 
ABL - correct answer Articulating Boom Loader 
 
A designation of the NCCCO Articulating Cr...
Vista previa 2 fuera de 13 páginas
Añadir al carritoA&L - correct answer Antenna & Line Specialty 
 
A designation of the NWSA Telecommunication Program 
 
ABC - correct answer Articulating Boom Crane 
 
A designation of the NCCCO Articulating Crane Program 
 
ABL - correct answer Articulating Boom Loader 
 
A designation of the NCCCO Articulating Cr...
Where is the best location for leveling a crane - correct answer Upperworks 
 
When determining the "gross load " the best method is: - correct answer Get an accurate load weight and add rigging 
 
By order of hitch strength, which is the correct Answer? - correct answer Basket, vertical, chocker ...
Vista previa 2 fuera de 5 páginas
Añadir al carritoWhere is the best location for leveling a crane - correct answer Upperworks 
 
When determining the "gross load " the best method is: - correct answer Get an accurate load weight and add rigging 
 
By order of hitch strength, which is the correct Answer? - correct answer Basket, vertical, chocker ...
OSHA 1910 - correct answer General Industry Standards 
 
OSHA 1926 - correct answer Construction Industry Standards 
 
OSHA 1910.180 - correct answer Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - correct answer Slings 
 
OSHA 1926.251 - correct answer Rigging Equipment used for material ha...
Vista previa 2 fuera de 5 páginas
Añadir al carritoOSHA 1910 - correct answer General Industry Standards 
 
OSHA 1926 - correct answer Construction Industry Standards 
 
OSHA 1910.180 - correct answer Crawler, Locomotive and Truck Cranes 
 
OSHA 1910.184 - correct answer Slings 
 
OSHA 1926.251 - correct answer Rigging Equipment used for material ha...
1. A wire rope that is a 6x19 classification could have how many wires per strand? - correct answer 15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? - correct answer Each day before use 
 
3. Which considerations should be given to suspend lifting operations ...
Vista previa 2 fuera de 6 páginas
Añadir al carrito1. A wire rope that is a 6x19 classification could have how many wires per strand? - correct answer 15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? - correct answer Each day before use 
 
3. Which considerations should be given to suspend lifting operations ...
Splices in rall tracks shall have - correct answer Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer Daily 
 
If power fails during operations, the following shouldn't apply - correct answer Do your best to finish moving load where it was designated to...
Vista previa 2 fuera de 14 páginas
Añadir al carritoSplices in rall tracks shall have - correct answer Smooth Joints 
 
Hydraulic systems should have their proper fluid level checked - correct answer Daily 
 
If power fails during operations, the following shouldn't apply - correct answer Do your best to finish moving load where it was designated to...
What is the max included angle for a shackle? - correct answer 120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - correct answer 80 % 
 
The center of gravity location of a load may _________of the load - correct answer Not be located on ...
Vista previa 1 fuera de 3 páginas
Añadir al carritoWhat is the max included angle for a shackle? - correct answer 120 Degrees 
 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency of? - correct answer 80 % 
 
The center of gravity location of a load may _________of the load - correct answer Not be located on ...
When hook-suspended personnel platforms are lifted with a telescopic boom crane, - correct answer An anti two-block devise must be provided 
 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions are disabled when the device is activated? - correct ans...
Vista previa 1 fuera de 2 páginas
Añadir al carritoWhen hook-suspended personnel platforms are lifted with a telescopic boom crane, - correct answer An anti two-block devise must be provided 
 
When using a telescopic boom crane equipped with an anti two-block device, which hydraulic functions are disabled when the device is activated? - correct ans...
According to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? - correct answer 16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? - correct answer 17 feet 8 inches 
 
When working around power lines you must: - c...
Vista previa 2 fuera de 5 páginas
Añadir al carritoAccording to OSHA, what clearance should a crane in transit keep while going under 
445KV lines? - correct answer 16 feet 
 
While operating a crane near 280KV powerlines, what distance does OSHA require you to 
keep? - correct answer 17 feet 8 inches 
 
When working around power lines you must: - c...
Overhead cranes with more than one hoisting unit shall have? - correct answer Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - correct answer Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - correct answer Remo...
Vista previa 2 fuera de 10 páginas
Añadir al carritoOverhead cranes with more than one hoisting unit shall have? - correct answer Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - correct answer Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - correct answer Remo...
Compradores de Stuvia evaluaron más de 700.000 resúmenes. Así estas seguro que compras los mejores documentos!
Puedes pagar rápidamente y en una vez con iDeal, tarjeta de crédito o con tu crédito de Stuvia. Sin tener que hacerte miembro.
Tus compañeros escriben los resúmenes. Por eso tienes la seguridad que tienes un resumen actual y confiable. Así llegas a la conclusión rapidamente!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Nuestra garantía de satisfacción le asegura que siempre encontrará un documento de estudio a tu medida. Tu rellenas un formulario y nuestro equipo de atención al cliente se encarga del resto.
Stuvia is a marketplace, so you are not buying this document from us, but from seller brittton. Stuvia facilitates payment to the seller.
No, you only buy this summary for $32.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
45,681 summaries were sold in the last 30 days
Founded in 2010, the go-to place to buy summaries for 14 years now