Npdes Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Npdes? On this page you'll find 271 study documents about Npdes.

Page 2 out of 271 results

Sort by

CISEC Exam Solved 100% Correct.
  • CISEC Exam Solved 100% Correct.

  • Exam (elaborations) • 8 pages • 2023
  • CISEC Exam Solved 100% Correct.
    (0)
  • $12.99
  • 1x sold
  • + learn more
CISEC abbreviations fully solved graded A+ 2024/2025
  • CISEC abbreviations fully solved graded A+ 2024/2025

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • CISEC abbreviations EPA Environmental Protection Agency S&EC Drawings Sediment and Erosion Control Drawings Brainpower Read More CWA Clean Water Act NPDES National Pollutant Discharge Elimination System BMPs Best Management Practices SW Stormwater
    (0)
  • $17.99
  • + learn more
CESSWI Part 2 Exam Questions And Answers All Verified
  • CESSWI Part 2 Exam Questions And Answers All Verified

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • CESSWI Part 2 Exam Questions And Answers All Verified Multiple Hat Role Primary Role - Determine Regulatory Compliance of site Official Representative On-Site Fact Finder and Record Keeper Enforcement Case Developer Technical Instructor CESSWI Certified Erosion, Sediment and StormWater Inspector Good Inspectors Skills Inquisitiveness, Thoroughness, Consistency, Integrity, Conflict Resolution, and Communication Plan Types SWPPP, ESCP, Drainage/Grading Plan, SPCC, SWMP ...
    (0)
  • $14.99
  • + learn more
PUBH 6011 Unit 8 Exam Questions with Correct Answers
  • PUBH 6011 Unit 8 Exam Questions with Correct Answers

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • PUBH 6011 Unit 8 Exam Questions with Correct Answers describe the major features of the clean water act (eg NPDES) and the safe drinking water act (eg MCL, MCLG) - Answer-MCLG- maximum contaminant level goal- level at which there would be no adverse effect. Does not take into account cost of technical feasibility. MCL- maximum contaminant level - can be adverse effects, takes cost etc into account NPDES - national pollutant discharge elimination system, permitting system under CWA for nu...
    (0)
  • $12.49
  • + learn more
CEPSCI 111 PRACTICE TEST QUESTIONS AND ANSWERS
  • CEPSCI 111 PRACTICE TEST QUESTIONS AND ANSWERS

  • Exam (elaborations) • 15 pages • 2024
  • 1972 clean water act - ️️Administered by the US environmental protection agency (EPA) Created the NPDES 1987 - ️️Amendment to CWA CALLED WATER QUALITY ACT NPDES in south carolina - ️️South Carolina is NPDES delegated state. NPDES regulations are administered by - ️️SCDHEC CGP authorizes - ️️stormwater discharges from construction sites Who must obtain NPDES coverage - ️️land disturbing activities greater than or equal to 1 acre -land disturbance less than ...
    (0)
  • $7.99
  • + learn more
Cesswi 1 Questions With Complete Solutions
  • Cesswi 1 Questions With Complete Solutions

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • Cesswi stands for correct answer: Certified Erosion, Sediment, and Storm Water Inspector A Cesswi is qualified to perform inspections in one or more of the following areas: correct answer: Construction Post Construction Industrial/ Multi-sector Municipal (MS4) Cesswi professional are required to accumulate a minimum of ____ professional development hours (PDHs) over a ____ year period to maintain their credential correct answer: 6; 1 PDH requirements correct answer: Not to exceed...
    (0)
  • $10.49
  • + learn more
CESSWI PART I questions with correct answers
  • CESSWI PART I questions with correct answers

  • Exam (elaborations) • 22 pages • 2023
  • Available in package deal
  • CESSWI is qualified to preform what inspections? Answer Construction, post construction, industrial, MS4 Clean Water Act year of creation and intent of law Answer 1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US CWA Section 402 Answer Est. NPDES System, originally focused on industrial process waste water and POTW CWA Section 404 Answer regulated impacts to waters of the US, typically associated with a 401 certification CWA Section 401 A...
    (0)
  • $13.49
  • + learn more
Wastewater D License Exam Study Questions and Answers 2024-2025
  • Wastewater D License Exam Study Questions and Answers 2024-2025

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • How many PPB equals one PPM? - One thousand parts per billion equals one part per million If the bubbler system air supply line at the wet well is clogged, what will this cause the pump to do? - Pressure build up in the supply line would signal more water column then there really was, causing the pump to run longer than necessary, possibly not kick off and run continually If the bubbler system air supply line at the wet well has a hole in it above the water level, what will this cause the ...
    (0)
  • $14.99
  • + learn more
WALMART / SAM'S SAFETY, EMPLOYMENT, WASTE, STORMWATER COMPLIANCE CERTIFICATION EXAM 2024
  • WALMART / SAM'S SAFETY, EMPLOYMENT, WASTE, STORMWATER COMPLIANCE CERTIFICATION EXAM 2024

  • Exam (elaborations) • 8 pages • 2024
  • WALMART / SAM'S SAFETY, EMPLOYMENT, WASTE, STORMWATER COMPLIANCE CERTIFICATION EXAM 2024 The 1970's law that set into place the regulation of stormwater is: -the federal pollution discharge elimination rule -the stormwater pollution control act -the national water control act -the clean water act - correct answer the clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation -NOI -NPDES -NOT -DOT - correct a...
    (0)
  • $15.49
  • + learn more
CESSWI PART I QUESTIONS WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025
  • CESSWI PART I QUESTIONS WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • CESSWI PART I QUESTIONS WITH COMPLETE SOLUTIONS 100% VERIFIED 2024/2025 CESSWI is qualified to preform what inspections? - Correct Answer Construction, post construction, industrial, MS4 Clean Water Act year of creation and intent of law - Correct Answer 1972, enacted to restore and maintain the physical, bio, chem integrity of the waters of the US CWA Section 402 - Correct Answer Est. NPDES System, originally focused on industrial process waste water and POTW CWA Section 404 - Correct...
    (0)
  • $10.49
  • + learn more