Construction wiring nec Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Construction wiring nec? On this page you'll find 72 study documents about Construction wiring nec.

All 72 results

Sort by

Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution Popular
  • Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution

  • Exam (elaborations) • 3 pages • 2023
  • Available in package deal
  • Level 1 Module 10 Basic Electrical Construction Drawings Exam 2023 with complete solution A cutaway view of a building or object is known as a(n)______. Sectional drawing What is the total connected load of Circuit A-1 if each of the Type C lighting fixtures in the figure above has a total lamp and ballast load of 150VA? 1,200VA In which division of the MasterFormat is electronic safety covered? Division 28 A section line on a drawing shows The location of the section on the plan On e...
    (1)
  • $11.49
  • 1x sold
  • + learn more
Construction Wiring NEC Exam 2024
  • Construction Wiring NEC Exam 2024

  • Exam (elaborations) • 8 pages • 2024
  • Construction Wiring NEC Exam 2024...
    (0)
  • $9.99
  • + learn more
NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS
  • NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 15 (NFPA 70 Table 314.16(A)) What is the first process or step you must take when working on a panel supplied with 120VAC? Lock out and Tag out the power source If power supplies are located remotely from the FACP, where shall their locations be posted? Fire alarm control panel (NFPA 72 10.6.8.2)...
    (0)
  • $9.99
  • + learn more
Neiep piping and wiring the machine room and Hostway 510 review questions and and answers
  • Neiep piping and wiring the machine room and Hostway 510 review questions and and answers

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • Neiep piping and wiring the machine room and Hostway 510 review questionsHard hat - correct answer One piece of safety equipment you should never be without on an elevator installation is your _______ NEC, ASME Code - correct answer Two manuals which you need a working knowledge of are the _______ and _______ Green, Red - correct answer Welding hose can be visually identified because the oxygen hose is _______, and the acetylene hose is _______ Mechanical ground - correct answer The thi...
    (0)
  • $14.99
  • + learn more
Journeyman Electrician's Licensing Exam Questions With Correct Answers
  • Journeyman Electrician's Licensing Exam Questions With Correct Answers

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • NEC Article ______ defines breakers and fuses. - Answer According to NEC Article 100, a device that opens and closes a circuit by nonautomatic means automatically closes for a predetermined overcurrent. Annex _____ of NEC covers conduit fill. - Answer Annex C of NEC covers conduit and tubing fill for conductors and fixture wire fill. NEMA stands for National Electrical Manufacturers Association - Answer True - NEMA is the acronym for National Electrical Manufacturers Association. What d...
    (0)
  • $12.99
  • + learn more
NEC 2011 Journeyman Electrical Exam  Study Guide (Michigan)
  • NEC 2011 Journeyman Electrical Exam Study Guide (Michigan)

  • Exam (elaborations) • 23 pages • 2024
  • Available in package deal
  • NEC 2011 Journeyman Electrical Exam Study Guide (Michigan) Grounding and Bonding: Where outside, aluminum or copper-clad aluminum grounding electrode conductors shall not be terminated within ____in. of Earth. A. 12 in. B. 18 in. C. 24 in. D. 36 in. - B. 18 in. 250.64(A) Temporary Installations: When used by personnel during construction, remodeling, maintenance repair, or demolition of a building, GFCI (ground fault circuit interrupter) protection is required for all 125 ...
    (0)
  • $9.99
  • + learn more
NICET LEVEL 1  EXAM 2023 WITH 100% CORRECT ANSWERS
  • NICET LEVEL 1 EXAM 2023 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 15 (NFPA 70 Table 314.16(A)) What is the first process or step you must take when working on a panel supplied with 120VAC? Lock out and Tag out the power source If power supplies are located remotely from the FACP, where shall their locations be posted? Fire alarm control panel (NFPA 72 10.6.8.2) _______ 90 degree bends are permitted in an EMT r...
    (0)
  • $16.49
  • + learn more
CSLB License Health & Safety Practice Test Exam Review 2024
  • CSLB License Health & Safety Practice Test Exam Review 2024

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • CSLB License Health & Safety Practice Test Exam Review 2024 What does it mean when the underground service alert marks the grounds with WHITE stakes and markings? - ANSProposed Excavation What is the length a ladder must extend above the excavation/trench? - ANS-3 feet When should an employee wear foot and/or leg protection? - ANS-ALL -When heavy objects might roll onto or fall on the employee's feet -Working with sharp objects such as nails or spikes that could pierce the soles or uppers...
    (0)
  • $14.49
  • + learn more
NCCER Electrical Level 1 Mod 1 exam 2023 with100% correct answers
  • NCCER Electrical Level 1 Mod 1 exam 2023 with100% correct answers

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • The NCCER electrical training program applies DOL standards and is a - correct answer -four-year program Entry into an apprenticeship program is likely to require a(n) - correct answer -GATB Form Test The minimum standards for the safe installation of electrical systems can be found in - correct answer -the National Electrical Code (NEC) OSHA standards for general industry are covered in - correct answer -29 CFR, Parts The termination of devices and fixtures is completed during a co...
    (0)
  • $17.49
  • + learn more
CSLB License Health & Safety Practice  Exam With Complete Solution Graded A+
  • CSLB License Health & Safety Practice Exam With Complete Solution Graded A+

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • What does it mean when the underground service alert marks the grounds with WHITE stakes and markings? - Answer-Proposed Excavation What is the length a ladder must extend above the excavation/trench? - Answer-3 feet When should an employee wear foot and/or leg protection? - Answer-ALL -When heavy objects might roll onto or fall on the employee's feet -Working with sharp objects such as nails or spikes that could pierce the soles or uppers of ordinary shoes -Exposure to molten metal and ...
    (0)
  • $7.99
  • + learn more